The Maine Department of Transportation (MaineDOT) is a cabinet-level state agency with primary responsibility for statewide transportation by all modes of travel. MaineDOT employs approximately 1,900 people and expends or disburses over $600 million per year, including federal, state, and local funds.

Note: Many state documents are offered in PDF format. To view PDF documents, you will need the free Adobe Reader. If you need assistance, view our Maine government PDF Help page or contact the contributing Maine State agency via the link on the left sidebar under “Links”.

Follow


Submissions from 2025

PDF

Replacement of Tuttle Road Bridge : Final Geotechnical Design Report, Hardesty & Hanover, LLC

PDF

Bangor I-95 Bridges Replacement Project: Kenduskeag Avenue and Stillwater Avenue Bridge Improvements, Thomas Senior and Jerry Dostie

PDF

Joshua Chamberlain Bridge Rehabilitation Project : Preliminary Public Meeting Presentation, Michael Wight

Submissions from 2024

PDF

MaineDOT Local Cost Share Policy; Updated December 2, 2024

PDF

Calais Branch Rail Corridor Study : Calais to Ayers Junction, Maine, VHB and RKG

PDF

Maine's Updated Plan for Electric Vehicle (EV) Infrastructure Deployment (Maine's NEVI Plan); Submitted to Federal Highway Administration September 2024, Maine Department of Transportation

PDF

Route 1 Corridor DRAFT Transportation Study : Wells, Maine (August, 2024), VHB

PDF

Deer Isle Causeways Feasibility Study Final Report, Stantec Consulting Services Inc.

PDF

Presentation : Belfast Active Transportation & Accessibility Plan : Public Workshop #1 : June 11, 2024

PDF

2024 Maine Integrated Freight Strategy, Maine Department of Transportation

PDF

Mountain Division Rail Corridor : Interim Trail – Standish to Fryeburg Planning Feasibility Study, Dakota Hewlett and Lori Driscoll

PDF

Traffic Volume Counts : 2023 Annual Report, Maine Department of Transportation

Submissions from 2023

PDF

MPO/MaineDOT Cooperative Planning Reenvisioned

PDF

Bucksport Safety, Accessibility and Economic Study (2023), TYLin

PDF

Deer Isle Causeways Study Public Meeting Presentation : August 1, 2023, Jarod Farn-Guillette and Martin Rooney

PDF

MaineDOT Lower Road Rail Corridor Study; Brunswick to Augusta, Maine, VHB / Vanasse Hangen Brustlin, Inc. and RKG

PDF

Maine's Updated Plan for Electric Vehicle (EV) Infrastructure Deployment (Maine's NEVI Plan); Submitted to Federal Highway Administration August 2023, Maine Department of Transportation

PDF

Maine State Transit Plan : Existing Conditions Assessment (April 2023), Cambridge Systematics

PDF

Maine State Active Transportation Plan (March 2023), VHB / Vanasse Hangen Brustlin, Inc.

PDF

Maine State Rail Plan (March 2023), Maine Department of Transportation and Cambridge Systematics

PDF

Maine State Transit Plan : Needs Assessment (March, 2023), Cambridge Systematics

PDF

Working to Move Maine : MaineDOT's Long-Range Transportation Plan (March, 2023), Cambridge Systematics

PDF

2023 Maine Highway Safety Improvement Program

PDF

Family of Plans : A Compilation of Strategic Transportation Plans

PDF

Working to Move Maine : Maine State Active Transportation Plan Overview

Submissions from 2022

PDF

MaineDOT Transportation Asset Management Plan, December 2022

PDF

Maine State Rail Plan (December 2022), Cambridge Systematics

PDF

Working to Move Maine : Maine State Rail Report (Summary), Maine Department of Transportation

PDF

Maine's Updated Plan for Electric Vehicle Infrastructure Deployment (Maine PEVID); Submitted to Federal Highway Administration July 2022, Maine Department of Transportation

PDF

Cooperative Planning Process for Non-Metropolitan Local Officials

PDF

Mountain Division Feasibility Study : Potential Uses and Economic Benefits; Summary Report, HNTB and rbouvier Consulting

PDF

Presentation : Mountain Division Feasibility Study, Mountain Division Rail Corridor Use Advisory Council

PDF

Maine's 2022 Strategic Highway Safety Plan

Submissions from 2021

PDF

Public Involvement in Transportation Decision-Making

PDF

Summary of Public Comments on Machias Dyke Bridge Project

Submissions from 2020

PDF

Revised Geotechnical Design Report : Twin Bridge #5315 Over West Branch Souadabscook Stream, Hampden, Maine, Golder Associates, Inc.

PDF

MaineDOT Projects From Concept Through Construction (Infographic)

Submissions from 2019

PDF

Maine State Ferry Service — Tariff No. 9, Version 9.1 (Effective January 9, 2020), Maine State Ferry Service and Maine Department of Transportation

PDF

Lewiston-Auburn Passenger Rail Service Plan : Operating Plans and Corridor Assessments (May, 2019), VHB / Vanasse Hangen Brustlin, Inc. and WSP

PDF

Historic Bridge Survey; Metal Truss Re-evaluation; April 2019 Supplement to Historic Bridge Survey, Maine Department of Transportation

PDF

MaineDOT Work Plan Calendar Years 2019-2020-2021, Maine Department of Transportation

PDF

Hampden Hydraulic Study

Books from 2018

PDF

New Madawaska Land Port of Entry and International Bridge Project Draft Supplemental Environmental Impact Statement and Draft Programmatic Section 4(f) Evaluation, U.S. General Services Administration, Federal Highway Administration, and Maine Department of Transportation

PDF

Preliminary Inventory and Assessment Report of the Lewiston Lower Branch Rail Corridor; Lewiston/Lisbon, Maine; September 14, 2018, Sebago Technics and Maine Department of Transportation

PDF

Transportation Needs of Maine Veterans : Final Report to the 128th Maine Legislature

PDF

Maine Native Plants for Roadside Restoration, Heather McCargo, Kathryn Dillon, Lisa Looke, and Maine Department of Transportation

PDF

Maine Transit Regions Map (2018), Bureau of Maintenance & Operations and Maine Department of Transportation

PDF

Sharing the Road with Horse-Drawn Buggies, Maine Department of Transportation

PDF

Stephen A. Bean Municipal Airfield Master Plan Update, 2018, DuBois & King, Inc.

PDF

Traffic Volume Counts : 2017 Annual Report, Maine Department of Transportation

PDF

Urban Compact Areas : State vs Municipal Maintenance Responsibilities on State and State Aid Highways, 2018, Maine Department of Transportation

Submissions from 2017

PDF

Maine Integrated Freight Strategy Final Report, November 2017, Cambridge Systematics

PDF

Report to Commissioner David Bernhardt from the Task Force on Roadway Safety, October 3, 2017, The Knight Canney Group and Task Force on Roadway Safety

PDF

Eastport Intermodal Commodity Study, 2017, HDR, Inc.

PDF

Sanford Seacoast Regional Airport Master Plan Update, Stantec

PDF

Down East Sunrise Trail Economic Impact Assessment, Hancock County Planning Commission

PDF

High Crash Locations by County with Rural/Urban Designation, 2014-2016, Maine Department of Transportation and Maine Traffic Engineering Division

PDF

Traffic Volume Counts : 2016 Annual Report, Maine Department of Transportation

PDF

Understanding Rumble Strips: Improving Safety on Maine Roads (Rev. 2017), Duane Brunell

Submissions from 2016

PDF

Maine DOT Roads Report, 2016, Maine Department of Transportation

PDF

Safety Performance on Maine’s Rumble Strip Corridors, Duane Brunell

PDF

Advanced Bridge Safety Initiative: Phase 2 Task 3- Instrumentation During Live Load Testing and Load Rating of Five Reinforced Concrete Slab Bridges, 2016, Maine Transportation Research Division, Maine Department of Transportation, William Davids, and John C. Bridge

PDF

Central York County Connections Study : Final Study Report, 2016, Maine Department of Transportation

PDF

Bridge-in-a-Backpack™ Task 5: Guidelines for Quality Assurance, 2016, Maine Research Transportation Division, Maine Department of Transportation, and Keenan Goslin

PDF

Advanced Bridge Safety Initiative: Phase 2 Task 1 Rivet Testing of Rivets Taken from Maine Truss Bridge, 2016, Maine Transportation Research Division, Maine Department of Transportation, and Scott Tomlinson

PDF

MaineDOT Delivers 2015 Year-End Report, Maine Department of Transportation

PDF

Bridge-in-a-Backpack™ Task 4: Development of Improved Arch Concrete Mix to Facilitate Field Use, 2016, Maine Transportation Research Division, Maine Department of Transportation, and Keenan Goslin

PDF

Bridge-in-a-Backpack™ Task 6: Guidelines for Long Term Inspection and Maintenance, 2016, Maine Transportation Research Division, Maine Department of Transportation, and Keenan Goslin

PDF

Bridge-in-a-Backpack™ Task 3.1: Investigate Soil-Structure Interaction – Experimental Design, 2016, Maine Transportation Research Division, Maine Department of Transportation, Harold J. Walton, Bill Davids, Melissa Maynard, and Keenan Goslin

PDF

Bridge-in-a-Backpack™ Task 3.2: Investigate Soil-Structure Interaction – Modeling and Experimental Results of Steel Arches, 2016, Maine Transportation Research Division, Maine Department of Transportation, Harold J. Walton, Bill Davids, Melissa Maynard, and Keenan Goslin

PDF

Bridge-in-a-Backpack™ Task 3.3: Investigate Soil-Structure Interaction – Modeling and Experimental Results of Concrete Filled FRP Tube Arches, 2016, Maine Transportation Research Division, Maine Department of Transportation, and Harold J. Walton

PDF

MaineDOT Delivers 2016 Year-End Report, Maine Department of Transportation

PDF

MaineDOT Strategic Plan, 2016 Update, Maine Department of Transportation

PDF

Traffic Volume Counts : 2015 Annual Report, Maine Department of Transportation

Submissions from 2015

PDF

Experimental Demonstration of Xypex Additive in Concrete to Improve Durability. Technical Report 15-11, Maine Department of Transportation

PDF

New Ferry Presentation for the Maine State Ferry Service, Gilbert Associates

PDF

Maine Strategic Transit Plan 2025, Peter Schauer Associates

PDF

Economic Impacts of Expanded Marine Port Operations in Washington County, Maine, Todd Gabe, Catherine Dickerson, and Johnathan Rubin

PDF

Cecil and Elmer Play it Straight or, Safe Driving in Construction Zones, March 11, 2015, Maine Department of Transportation

PDF

Elmuh, on Safe Motorin' (Think Down East Accent), March 11, 2015, Maine Department of Transportation

PDF

Contractor/Designer Work History Form, March 10, 2015, Maine Department of Transportation

PDF

Design Exception Review Team Meeting Worksheet, March 10, 2015, Maine Department of Transportation

PDF

Form A : Technical Proposal Submission Form, Freeport Route 136, March 10, 2015, Maine Department of Transportation

PDF

Form C : Proposal Guaranty Form - Freeport Route 136, March 10, 2015, Maine Department of Transportation

PDF

Form D : Price Proposal - Freeport Route 136, March 10, 2015, Maine Department of Transportation

PDF

Form F : Contract Performance Bond - Freeport Route 136, March 10, 2015, Maine Department of Transportation

PDF

Form G : Contract Payment Bond - Freeport Route 136, March 10, 2015, Maine Department of Transportation

PDF

Form H : Opinion of Counsel - Freeport Route 136, March 10, 2015, Maine Department of Transportation

PDF

Tri-State Performance Measures. 2014 Annual Report, Maine Department of Transportation

PDF

Historic Bridges of Maine: 350 Years of Bridge and Roadway Design 2015, Maine Department of Transportation, David E. Gardner, and Lisa Churchill-Dickson

PDF

I-395/Route 9 Transportation Study. Appendices to the Final Environmental Impact Statement 2015, Maine Department of Transportation

PDF

I-395/Route 9 Transportation Study. Final Environmental Impact Statement 2015, Maine Department of Transportation

PDF

MaineDOT Work Plan Calendar Years 2015-2016-2017, Maine Department of Transportation

PDF

Traffic Volume Counts : 2014 Annual Report, Maine Department of Transportation

Submissions from 2014

PDF

Wiscasset Municipal Airport Master Plan Update, October 2014, Stantec

PDF

Park & Ride Survey Final Report: 2013 User Survey and 2014 Addendum, 2014, Maine Department of Transportation

PDF

Route 26 Corridor Study. Gray, Maine. Final Report. 2014, Maine Department of Transportation and T.Y.Lin International

PDF

Maine State Rail Plan, 2014, Maine Department of Transportation

PDF

Maine Integrated Freight Strategy Final Report, 2014, Maine Department of Transportation

PDF

Filing a Discrimination Complaint, May 23, 2014, Maine Department of Transportation